So its been done for awhile now…back in november to be exact but just now got the photos up. So on to house project #2…the bathroom. I gutted this thing down and redid everything. It was a tough project old tile floor consisted of 4 inches of concrete, on the 2nd floor no less. So details include…ripped all out, new plumbing, electric, exhaust fan, subfloor, tile, tub, insulation, window, hardwood floor, fixtures, vanity, closet, and lighting.

View the photos: Bathroom Project.


COMMENTS / ONE COMMENT

man, lots of magazines in there. I’ll be over!

r. thompson added these pithy words on Jan 08 07 at 4:03 pm

SPEAK / ADD YOUR COMMENT
Comments are moderated.

XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Return to Top

Bathroom Project complete.

FRESH / LATEST POSTS

TAG / CLOUD